Tappan Zee Bridge Replacement Client: Blackmore shared the details that went into the extensive planning of the project during a tour given exclusively to an Advance reporter and photographer. The replacement bridge is being built to the south of the existing Goethals Bridge, which will remain in service during the construction period and then be demolished after the new spans open to traffic.

The drilled shafts were used to "minimize the amount of excavation that's necessary to be done," said Blackmore.

Goethals Bridge Replacement Project

The demolition pushed back the construction schedule. Its unusual [4] mid-span height was a requirement of the New Jersey ports. That's what's different about a P3. Blackmore, program director for the Goethals Bridge Modernization Program. The total traffic in was Sometimes though, we also have an opportunity to develop new technologies or competencies that we can bring to future projects.

They were designed by J.

Outerbridge Crossing

DBA is the foundation design engineer of record and this project provides an example of how rock-socketed drilled shafts can provide a reliable and cost-effective means of supporting a major bridge by taking advantage of the high resistances that can be achieved.

Bythe Port Authority had developed a conceptual plan to add a second span to the Goethals Bridge. Sequential bridge removal plan including design of temporary truss members, local member stress releases, barge-based crane removal, jacking operations and floating caisson stability.

As a result, a new app that distinguishes between commercial and passenger vehicles was developed.

No. 5 - Goethals Bridge Replacement Project

Tappan Zee Constructors Description: With proven PPP experience, strong and stable finances, and leading safety and sustainability credentials, it is uniquely well-qualified for the Goethals Bridge Replacement Project. Fabricated all of the steel buckle plates.

The New Jersey side was designed with staggered SLC scales to compensate for the road curvature and changing slopes in the roadway, which can affect weigh-in-motion WIM accuracy. That study found that building a new, improved replacement bridge would be more cost-effective than continuing to rehabilitate and maintain the older span, and would better address the bridge's obsolete design.

NYCMBC will be working with KWM to identify qualified DBE companies, as well as offering assistance to companies with securing financing, bonding and assistance with the certification process if needed. The new bridge will be a dual-span 1,ft long cable-stayed bridge with approach spans of over 2, ft on each side.

Steinman was also a notable NY area bridge designer and a contemporary and rival of O. The bridge is supported on over drilled shaft foundations ranging in diameter from 4. Selco supplied approximately 1. The staggered scale layout allows the system to weigh the vehicles in two different locations as it passes through the system.

Originally the plan was to have a single tower support both eastbound and westbound.Construction Camera Public Web Page to Monitor and Document a Job Site with Image Hosting and Archive Solutions.

Update on Goethels Bridge Replacement Project By TINA CASEY. the new Goethals Bridge contractor will close one NJ bound lane on the NJ side of the Goethals Bridge that brings drivers to the NJ. bridge construction Outerbridge Crossing Port Authority NY/NJ: bridge construction on Outerbridge Crossing eastbound New Jersey Side (Perth Amboy) to New York Side (Staten Island), Tuesday November 20th, thru Wednesday November 21st,PM thru AM, right lane closed.

The Goethals Bridge (/ ˈ ɡ ɒ θ əl z / GOTH-əlz) is the name of two crossings connecting Elizabeth, New Jersey, to Staten Island, New York, in the United dominicgaudious.net are two cable-stayed spans and cross a strait known as Arthur dominicgaudious.net bridges are operated by the Port Authority of New York and New Jersey (PANYNJ).

Update on Goethels Bridge Replacement Project

The original cantilever. Goethals Bridge Replacement Project Selco Manufacturing Corp., has been awarded over Feet of Tube Railing for the Main Span as well as the Electrical Expansion Devices for multiple piers and the Cast Iron Barrier Boxes.

The project will replace the existing Goethals Bridge that was built in the s and carries I over the Arthur Kill River between Elizabeth, New Jersey and Staten Island, New York.

Construction of drilled shafts continues as the superstructure begins to emerge over the skyline between Elizabeth, NJ and Staten Island, NY.